IE Warning
Your browser is out of date!

This website uses the latest web technologies so it requires an up-to-date, fast browser!
Try Firefox or Chrome!
Back to top

TRANSPORT

Within the transport sector OGI have designed dewatering systems and stable ground conditions for:

  • Roads
  • Road junctions
  • Railways
  • Canal structures
  • Bridges
  • Tunnels

 

Examples Include:
M74 Raith Interchange
Hydrogeological modelling, assessment including pumping test and consultancy.

Falkirk Wheel
Hydrogeological assessment including pumping test and dewatering consultancy.

A13 Thames London Gateway
Dewatering of terrace gravels and running sands for pipe jack tunnels and underpasses beneath the road.

Tyne Tunnel 2
Pumping test, hydrogeological assessment and consultancy.

Transport Sectors